Skip to main content Skip to secondary navigation

Provided the MVP (minimum viable product) redesign suggestions for the 16 cases from the perspective of schedule and cost impact to make robot construction feasible.

Main content start

Types of redesign metrics involved for the 16 cases

Types of redesign metrics involved for the 16 cases