Project Delivery
Main content start
Main content start
Results for: Project Delivery
- Cheng, Chin Pang, Kincho Law, and Hans Bjornsson. “A Distributed Portal-Based Platform for Engineering & Construction Supply Chain Interoperability”. Center for Integrated Facility Engineering, 2008. https://purl.stanford.edu/wk065tz3156.
- Gane, Victor, and John Haymaker. “Benchmarking Conceptual High-Rise Design Processes”. Center for Integrated Facility Engineering, 2008. https://purl.stanford.edu/xm514gk6039.
- Mourgues, Claudio, John Kunz, and Martin Fischer. “Decision, Decision-Making, Design, Management, Organization Models, Organizational Modeling, Process Modeling, Process Models, Project Management, Rationale, Rationale Clarity Framework, Validation”. Center for Integrated Facility Engineering, 2008. https://purl.stanford.edu/gw759nq5153.
- Haymaker, John, and Martin Fischer. “Formalizing Narratives to Better Communicate & Integrate Sustainable Design Processes & Information”. Center for Integrated Facility Engineering, 2008. https://purl.stanford.edu/hj740dp1305.
- Chachere, John, and John Haymaker. “Framework for Measuring Rationale Clarity of AEC Design Decisions”. Center for Integrated Facility Engineering, 2008. https://purl.stanford.edu/fm497vr4971.
- Haymaker, John, John Chachere, and Reid Senescu. “Measuring and Improving Rationale Clarity in a University Office Building Design Process”. Center for Integrated Facility Engineering, 2008. https://purl.stanford.edu/qv027rx2001.
- Mourgues, Claudio, Martin Fischer, and John Kunz. “Method To Produce Field Instructions From Product And Process Models For Cast-In-Place Concrete Operations”. Center for Integrated Facility Engineering, 2008. https://purl.stanford.edu/rf458fw0337.
- Flager, Forest, Benjamin Welle, Prasun Bansal, Grant Soremekun, and John Haymaker. “Multidisciplinary Process Integration and Design Optimization of a Classroom Building”. Center for Integrated Facility Engineering, 2008. https://purl.stanford.edu/th826kk7081.
- Koo, Bonsang, Martin Fischer, and John Kunz. “A Formal Identification and Re-Sequencing Process for Rapid Generation of Sequencing Alternatives in CPM Schedules”. Center for Integrated Facility Engineering, 2007. https://purl.stanford.edu/nz387yd9469.
- Khanzode, Atul, Martin Fischer, Dean Reed, and Glenn Ballard. “A Guide to Applying the Principles of Virtual Design and Construction (VDC) to the Lean Project Delivery Process”. Center for Integrated Facility Engineering, 2006. https://purl.stanford.edu/bc980bz5582.
- Pan, Xiaoshan. “Computational Modeling of Human and Social Behaviors for Emergency Egress Analysis”. Center for Integrated Facility Engineering, 2006. https://purl.stanford.edu/fk214fw2802.
- Koo, Bonsang, Martin Fischer, and John Kunz. “Formalization of Construction Sequencing Rationale and Classification Mechanism to Support Rapid Generation of Sequencing Alternatives”. Center for Integrated Facility Engineering, 2006. https://purl.stanford.edu/mw447fv7116.
- Kam, Calvin. “Dynamic Decision Breakdown Structure: Ontology, Methodology, & Framework for Information Management in Support of Decision-Enabling Tasks in the Building Industry”. Center for Integrated Facility Engineering, 2005. https://purl.stanford.edu/qf915fz1421.
- Chachere, John. “Improving Project Performance by Predicting Engineering Impacts on Operations Failure Risks Using a Quantitative Model of Product, Organization, Process, and Environment”. Center for Integrated Facility Engineering, 2005. https://purl.stanford.edu/zz183dr4753.
- Taylor, John, and Raymond Levitt. “A New Model for Systemic Innovation Diffusion in Project-Based Industries”. Center for Integrated Facility Engineering, 2004. https://purl.stanford.edu/bk735dx2532.
- Min, Jung Ung, and Hans Bjornsson. “Construction Supply Chain Visualization Through Web Services Integration”. Center for Integrated Facility Engineering, 2004. https://purl.stanford.edu/dy994jj0972.
- Chachere, John. “Coordination, Decision Analysis, Design, Organization Models, Planning, Process Models, Product Models, Risk Analysis, Simulation, VDT, Virtual Design Team”. Center for Integrated Facility Engineering, 2004. https://purl.stanford.edu/dv294pz2005.
- Chachere, John. “Design Project Optimization”. Center for Integrated Facility Engineering, 2004. https://purl.stanford.edu/yz806ts5247.
- Koo, Bonsang. “Formalizing Construction Sequence Constraints for the Rapid Generation of Scheduling Alternatives”. Center for Integrated Facility Engineering, 2004. https://purl.stanford.edu/gq345sm7410.
- Akba?, Rag?p. “Geometry-Based Modeling and Simulation of Construction Processes”. Center for Integrated Facility Engineering, 2004. https://purl.stanford.edu/dc493cj2064.