Skip to content Skip to navigation

Publications

Found 40 results
Author Title [ Type(Desc)] Year
Filters: Keyword is Planning  [Clear All Filters]
Technical Report
Dixon-Smith, B., Kwok, A., Satterlee, R., Pincheira, F. & Howekamp, W. Comparison of Y2E2 Occupancy, Comfort, and Energy Audit to Building Objectives. (2011). at <https://purl.stanford.edu/jn445yz9261>
Pan, X. Computational Modeling of Human and Social Behaviors for Emergency Egress Analysis. (2006). at <https://purl.stanford.edu/fk214fw2802>
Miyaji, A. & Kunz, J. CONPAS: Application of Knowledge-Based System to Construction Planning. (1994). at <https://purl.stanford.edu/ms626qw0880>
Le Pape, C. Constraint Propagation in Planning. (1991). at <https://purl.stanford.edu/rx233qx1158>
Miyagawa, T., Kunz, J. & Velline, A. Construction Planning and Manageability Prediction. (1993). at <https://purl.stanford.edu/bw380hj8904>
Haymaker, J. & Chachere, J. Coordination, Design, Extreme Collaboration, ICE, Integrated Concurrent Engineering, Organization Models, Process Models, VDC, Virtual Design and Construction. (2009). at <https://purl.stanford.edu/fk542fd6085>
Manna, Z., Paltrinieri, M. & Waldinger, R. Deductive Synthesis of Concurrent Construction Plans. (1992). at <https://purl.stanford.edu/yd292dk0573>
Kam, C. Dynamic Decision Breakdown Structure: Ontology, Methodology, & Framework for Information Management in Support of Decision-Enabling Tasks in the Building Industry. (2005). at <https://purl.stanford.edu/qf915fz1421>
Koo, B., Fischer, M. & Kunz, J. A Formal Identification and Re-sequencing Process for Rapid Generation of Sequencing Alternatives in CPM Schedules. (2007). at <https://purl.stanford.edu/nz387yd9469>
Koo, B., Fischer, M. & Kunz, J. Formalization of Construction Sequencing Rationale and Classification Mechanism to Support Rapid Generation of Sequencing Alternatives. (2006). at <https://purl.stanford.edu/mw447fv7116>
Koo, B. Formalizing Construction Sequence Constraints for the Rapid Generation of Scheduling Alternatives. (2004). at <https://purl.stanford.edu/gq345sm7410>
Akbaş, R. Geometry-Based Modeling and Simulation of Construction Processes. (2004). at <https://purl.stanford.edu/dc493cj2064>
Kunz, J., Jin, Y., Levitt, R. E., Lin, S. - D. & Teicholz, P. The Intelligent Real-Time Maintenance Management (IRTMM) System: Support for Integrated Value-Based Maintenance Planning. (1995). at <https://purl.stanford.edu/tg222gx7093>
Aoki, T. Measurement Planning System for Information Integrated Construction. (1991). at <https://purl.stanford.edu/cz191dw5484>
Haymaker, J., Chachere, J. & Senescu, R. Measuring and Improving Rationale Clarity in a University Office Building Design Process. (2008). at <https://purl.stanford.edu/qv027rx2001>
Javernick-Will, A. & Levitt, R. Mobilizing Institutional Knowledge for International Projects: A Summary Report. (2009). at <https://purl.stanford.edu/sv172dq0732>
Barraquand, J. & Latombe, J. - C. On Nonholonomic Mobile Robots and Optimal Maneuvering. (1989). at <https://purl.stanford.edu/ny498kn3429>
Darwiche, A., Levitt, R. E. & Hayes-Roth, B. OARPLAN: Generating Project Plans in a Blackboard System by Reasoning about Objects, Actions and Resources. (1989). at <https://purl.stanford.edu/mq937jq4034>
Kim, T. Wan. Predicting Space Utilization of Buildings through Integrated and Automated Analysis of User Activities and Spaces. (2013). at <https://purl.stanford.edu/tm100bc3326>
Le Pape, C. Simulating Actions of Autonomous Agents. (1990). at <https://purl.stanford.edu/pg982pv8918>
Gupta, K., Yang, Z. & Jain, R. Urban Data Integration (UDI) using Proximity Relationship Learning for Design, Management and Operations of Sustainable Urban Systems. (2018). at <https://purl.stanford.edu/dq583pv0055>

Pages