Skip to content Skip to navigation

Publications

Found 36 results
Author [ Title(Desc)] Type Year
Filters: First Letter Of Title is I  [Clear All Filters]
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 
I
Hamledari, H. IFC-Enabled Site-to-BIM Automation: An Interoperable Approach Toward the Integration of Unmanned Aerial Vehicle (UAV)-Captured Reality into BIM. (2017). at <https://purl.stanford.edu/gf324nd7978>
Fergusson, K. Jean & Teicholz, P. Impact of Integration on Industrial Facility Quality with Appendix. (1993). at <https://purl.stanford.edu/xj721fn3242>
Ekström, M. A., Björnsson, H. C., Kunz, J., Levitt, R. E. & Nass, C. I. The Impact of Rating Systems on Subcontracting Decisions: A Transaction Cost Analysis. (2003). at <https://purl.stanford.edu/ws543qp7893>
Senescu, R. & Haymaker, J. Improving Design Processes through Collaborating, Sharing, and Understanding. (2009). at <https://purl.stanford.edu/qk084vw7946>
Kim, T. Wan, Kavousian, A., Fischer, M. & Rajagopal, R. Improving Facility Performance Prediction by Formalizing an Activity-Space-Performance Model. (2012). at <https://purl.stanford.edu/fk563np7925>
Ferguson, M. & Law, K. Improving Mobile Robot Navigation with Dynamic Building Information Models and Stochastic Neural Control. (2020). at <https://purl.stanford.edu/mx755tq2326>
Chachere, J. Improving Project Performance by Predicting Engineering Impacts on Operations Failure Risks Using a Quantitative Model of Product, Organization, Process, and Environment. (2005). at <https://purl.stanford.edu/zz183dr4753>
Hansen, K. Lee, Johnson, K. D. & C. Tatum, B. Incentives for Integrated Facilities Engineering in the Architectural, Engineering and Construction Industry. (1990). at <https://purl.stanford.edu/zy431pj0486>
Caloud, P., Choi, W., Latombe, J. - C., Le Pape, C. & Yim, M. Indoor Automation with Many Mobile Robots. (1992). at <https://purl.stanford.edu/ph142bh2282>
Staub-French, S. & Fischer, M. Industrial Case Study of Electronic Design, Cost, and Schedule Integration. (2001). at <https://purl.stanford.edu/my754ch7165>
Staub-French, S., Fischer, M. & Spradlin, M. Industrial Case Study of Electronic Design, Cost, and Schedule Integration. (1998). at <https://purl.stanford.edu/rv042xs2620>
Fergusson, K. Jean & Teicholz, P. Industrial Facility Quality Perspectives in Owner Organizations. (1992). at <https://purl.stanford.edu/zv728dq8909>
Yuventi, J. Influence of Layout and Other Design Choices on the Performance of Large-Scale Photovoltaic Systems. (2013). at <https://purl.stanford.edu/cy245sv2527>
Ekstrom, M. & Bjornsson, H. Information Technology and Purchasing Strategy: Two Necessary Enablers of More Efficient Construction Processes. (2004). at <https://purl.stanford.edu/vj216ct3146>
Shih, N. - J., Wu, M. - C. & Kunz, J. The Inspections of As-built Construction Records by 3D Point Clouds. (2004). at <https://purl.stanford.edu/sw479yp0718>
Kunz, J., Fischer, M., Haymaker, J. & Levitt, R. E. Integrated and Automated Project Processes in Civil Engineering: Experiences of the Center for Integrated Facility Engineering at Stanford University. (2002). at <https://purl.stanford.edu/qd179zq3943>
Wang, J. & Howard, C. H. Integrated Case-Based Reasoning for Structural Design. (1991). at <https://purl.stanford.edu/gd764wd4870>
Froese, T. Integrated Computer-Aided Project Management Through Standard Object-Oriented Models. (1992). at <https://purl.stanford.edu/zh399yk1433>
Nielsen, R. et al. Integrated Construction Planning: A Problem Analysis. (1992). at <https://purl.stanford.edu/bz278hc4860>
Yabuki, N. & Law, K. H. An Integrated Framework for Design Standards Processing. (1992). at <https://purl.stanford.edu/dx716hs0877>
Peterson, F., Fischer, M. & Tutti, T. Integrated Scope-Cost-Schedule Model System for Civil Works. (2009). at <https://purl.stanford.edu/zg914cj2512>
Khanzode, A. An Integrated, Virtual Design and Construction and Lean (IVL) Method for Coordination of MEP. (2010). at <https://purl.stanford.edu/db106qv2525>
Lai, T. Y. & Borja, R. I. Integrating AutoCAD with Finite Element Code to Model Underground Construction. (1998). at <https://purl.stanford.edu/gm790jd3605>
Divita, Jr., E. L., Fischer, M. & Kunz, J. Integration and Automation of Pre-Project Planning Through Circle Integration with a Shared Project Mode. (1998). at <https://purl.stanford.edu/vp644rb9556>
Hartmann, T., Fischer, M., Rank, E., Schreyer, M. & Neuberg, F. Integration of a Three Dimensional CAD Environment into an Interactive Workspace. (2003). at <https://purl.stanford.edu/jv094fv9889>

Pages