Publications
Main content start
Site content
- Yee, P. H. (2009). An Automated Method to Identify Occupant Interactions in Renovations of Occupied Buildings. CIFE Technical Report #185. Center for Integrated Facility Engineering. https://purl.stanford.edu/yr010gb4669
- Ho, P., & Fischer, M. (2009). An Examination of Current Practices in Identifying Occupant Interactions in Renovation Projects. CIFE Working Paper #121. Center for Integrated Facility Engineering. https://purl.stanford.edu/ms189mj2758
- Ho, P., Fischer, M., & Haymaker, J. (2009). Automated Identification of Occupant Interactions in Renovations of Occupied Buildings. CIFE Working Paper #122. Center for Integrated Facility Engineering. https://purl.stanford.edu/pt487nm2072
- Peterson, F., & Fischer, M. (2009). Case Study One: Programming in Field Engineering Quantity Collection. CIFE Working Paper #113. Center for Integrated Facility Engineering. https://purl.stanford.edu/wv821bx5766
- Peterson, F., Fruchter, R., & Fischer, M. (2009). Case Study: Scope-Cost-Time Integrated Model with Work Breakdown Structure. CIFE Working Paper #115. Center for Integrated Facility Engineering. https://purl.stanford.edu/gp708zc2122
- Chachere, J. (2009). Causes and Effects of Rationale Clarity in the AEC Design Industry. CIFE Working Paper #117. Center for Integrated Facility Engineering. https://purl.stanford.edu/qk265gz2370
- Haymaker, J., & Chachere, J. (2009). Coordination, Design, Extreme Collaboration, ICE, Integrated Concurrent Engineering, Organization Models, Process Models, VDC, Virtual Design and Construction. CIFE Technical Report #181. Center for Integrated Facility Engineering. https://purl.stanford.edu/fk542fd6085
- Senescu, R., & Haymaker, J. (2009). Improving Design Processes through Collaborating, Sharing, and Understanding. CIFE Working Paper #124. Center for Integrated Facility Engineering. https://purl.stanford.edu/qk084vw7946
- Peterson, F., Fischer, M., & Tutti, T. (2009). Integrated Scope-Cost-Schedule Model System for Civil Works. CIFE Working Paper #114. Center for Integrated Facility Engineering. https://purl.stanford.edu/zg914cj2512
- Javernick-Will, A., & Levitt, R. (2009). Mobilizing Institutional Knowledge for International Projects: A Summary Report. CIFE Technical Report #179. Center for Integrated Facility Engineering. https://purl.stanford.edu/sv172dq0732
- Ehrich, A., & Haymaker, J. (2009). Multi-Attribute Interaction Design: An Integrated Conceptual Design Process for Modeling Interactions and Maximizing Value. CIFE Technical Report #182. Center for Integrated Facility Engineering. https://purl.stanford.edu/gm101dc0845
- Chachere, J. (2009). Observation, Theory, and Simulation of Integrated Concurrent Engineering: Grounded Theoretical Factors and Risk Analysis Using Formal Models. CIFE Working Paper #118. Center for Integrated Facility Engineering. https://purl.stanford.edu/bt714bw6192
- Peterson, F., & Fischer, M. (2009). Project Monitoring Methods Exploratory Case Analysis: Industry Responses. CIFE Working Paper #112. Center for Integrated Facility Engineering. https://purl.stanford.edu/nc730zm7783
- Ho, P., Fischer, M., & Kam, C. (2009). Prospective Validation of Virtual Design and Construction Methods: Framework, Application, and Implementation Guidelines. CIFE Working Paper #123. Center for Integrated Facility Engineering. https://purl.stanford.edu/st246sw5809
- Chachere, J. (2009). Quantitative Method for Analyzing Engineering Defect Risks in Novel Projects. CIFE Working Paper #119. Center for Integrated Facility Engineering. https://purl.stanford.edu/qh238bh8552
- Kunz, J., Maile, T., & Bazjanac, V. (2009). Summary of the Energy Analysis of the First Year of the Stanford Jerry Yang & Akiko Yamazaki Environment & Energy (Y2E2) Building. CIFE Technical Report #183. Center for Integrated Facility Engineering. https://purl.stanford.edu/wm764pd5088
- Javernick-Will, A. (2009). Summary Report for Companies of Research Regarding the Mobilization of Institutional Knowledge for International Projects. CIFE Technical Report #180. Center for Integrated Facility Engineering. https://purl.stanford.edu/gv067fb6774
- Chachere, J., Kunz, J., & Levitt, R. (2009). The Role of Reduced Latency in Integrated Concurrent Engineering. CIFE Working Paper #116. Center for Integrated Facility Engineering. https://purl.stanford.edu/bd089dx8723
- Cheng, C. P., Law, K., & Bjornsson, H. (2008). A Distributed Portal-Based Platform for Engineering & Construction Supply Chain Interoperability. CIFE Technical Report #173. Center for Integrated Facility Engineering. https://purl.stanford.edu/wk065tz3156
- Hartmann, T. (2008). A Grassroots Model of Decision Support System Implementations by Construction Project Teams. CIFE Technical Report #108. Center for Integrated Facility Engineering. https://purl.stanford.edu/gv950qy3147