Publications
Main content start
- Chachere, J. (2004). Design Project Optimization. CIFE Working Paper #095. Center for Integrated Facility Engineering. https://purl.stanford.edu/yz806ts5247
- Koo, B. (2004). Formalizing Construction Sequence Constraints for the Rapid Generation of Scheduling Alternatives. CIFE Technical Report #155. Center for Integrated Facility Engineering. https://purl.stanford.edu/gq345sm7410
- Akba?, R. (2004). Geometry-Based Modeling and Simulation of Construction Processes. CIFE Technical Report #151. Center for Integrated Facility Engineering. https://purl.stanford.edu/dc493cj2064
- Ekstrom, M., & Bjornsson, H. (2004). Information Technology and Purchasing Strategy: Two Necessary Enablers of More Efficient Construction Processes. CIFE Technical Report #160. Center for Integrated Facility Engineering. https://purl.stanford.edu/vj216ct3146
- Taylor, J., & Levitt, R. (2004). Inter-Organizational Knowledge Flow and Innovation Diffusion in Project-Based Industries. CIFE Working Paper #089. Center for Integrated Facility Engineering. https://purl.stanford.edu/bc506xw2626
- Bjornsson, H., Crow, R., & Huntington, H. (2004). International Comparisons of Electricity Restructuring: Considerations for Japan. CIFE Technical Report #150. Center for Integrated Facility Engineering. https://purl.stanford.edu/fj103cc9037
- Chachere, J., Kunz, J., & Levitt, R. (2004). Observation, Theory, and Simulation of Integrated Concurrent Engineering: Grounded Theoretical Factors that Enable Radical Project Acceleration. CIFE Working Paper #087. Center for Integrated Facility Engineering. https://purl.stanford.edu/mt071hz7530
- Chachere, J., Kunz, J., & Levitt, R. (2004). Observation, Theory, and Simulation of Integrated Concurrent Engineering: Risk Analysis Using Formal Models of Radical Project Acceleration. CIFE Working Paper #088. Center for Integrated Facility Engineering. https://purl.stanford.edu/dq405zf4697
- Khosraviani, B., & Levitt, R. (2004). Organization Design Optimization Using Genetic Programming. CIFE Working Paper #085. Center for Integrated Facility Engineering. https://purl.stanford.edu/py346cr6785
- Kiviniemi, A., Fischer, M., Bazjanac, V., & Paulson, B. (2004). PREMISS - Requirements Management Interface to Building Product Models: Problem Definition and Research Issues. CIFE Working Paper #092. Center for Integrated Facility Engineering. https://purl.stanford.edu/ds532qd2802
- Shih, N.-J., Wu, M.-C., & Kunz, J. (2004). The Inspections of As-built Construction Records by 3D Point Clouds. CIFE Working Paper #090. Center for Integrated Facility Engineering. https://purl.stanford.edu/sw479yp0718
- Fischer, M., & Kunz, J. (2004). The Scope and Role of Information Technology in Construction. CIFE Technical Report #156. Center for Integrated Facility Engineering. https://purl.stanford.edu/jb926sr1126
- Castillo, R., & Chung, N. C. (2004). The Value of Sustainability. CIFE Working Paper #091. Center for Integrated Facility Engineering. https://purl.stanford.edu/ny111sn1380
- Berring, B., & Ung, D. (2003). A Methodology for Environmentally Informed Decision-Making: Towards Sustainable Projects. CIFE Working Paper #083. Center for Integrated Facility Engineering. https://purl.stanford.edu/sc880by5645
- Thomsen, J., Levitt, R., Kunz, J., Nass, C., & Fridsma, D. (2003). A Trajectory for Validating Computational Emulation Models of Organizations. CIFE Technical Report #153. Center for Integrated Facility Engineering. https://purl.stanford.edu/db848hz3318
- Garcia, A. C. B., Kunz, J., Ekstrom, M., & Kiviniemi, A. (2003). Building a Project Ontology with Extreme Collaboration and Virtual Design & Construction. CIFE Technical Report #152. Center for Integrated Facility Engineering. https://purl.stanford.edu/jr207fd2953
- Chachere, J., Levitt, R., & Kunz, J. (2003). Can You Accelerate Your Project Using Extreme Collaboration? A Model Based Analysis. CIFE Technical Report #154. Center for Integrated Facility Engineering. https://purl.stanford.edu/sd007yg8399
- Zolin, R., Fruchter, R., & Hinds, P. (2003). Communication, Trust and Performance: The Influence of Trust on Performance in A/E/C Cross-functional, Geographically Distributed Work. CIFE Working Paper #078. Center for Integrated Facility Engineering. https://purl.stanford.edu/hf009vb6533
- Haymaker, J., Fischer, M., Kunz, J., & Suter, B. (2003). Engineering Test Cases to Motivate the Formalization of an AEC Project Model as a Directed Acyclic Graph of Views and Dependencies. CIFE Working Paper #080. Center for Integrated Facility Engineering. https://purl.stanford.edu/wj768bn8579
- Ekstr?m, M., & Bj?rnsson, H. (2003). Evaluating IT Investments in Construction: Accounting for Strategic Flexibility. CIFE Technical Report #139. Center for Integrated Facility Engineering. https://purl.stanford.edu/fn291fm5034