Skip to content Skip to navigation

Publications

Found 38 results
[ Author(Asc)] Title Type Year
Filters: First Letter Of Last Name is K  [Clear All Filters]
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 
K
Kunz, J., Jin, Y., Levitt, R. E., Lin, S. - D. & Teicholz, P. The Intelligent Real-Time Maintenance Management (IRTMM) System: Support for Integrated Value-Based Maintenance Planning. (1995). at <https://purl.stanford.edu/tg222gx7093>
Kunz, J., Levitt, R. & Fischer, M. Management and Leadership Education for Civil Engineers: Teaching Virtual Design and Construction for Sustainability. (2003). at <https://purl.stanford.edu/vq141qm4960>
Kunz, J., Fischer, M., Haymaker, J. & Levitt, R. E. Integrated and Automated Project Processes in Civil Engineering: Experiences of the Center for Integrated Facility Engineering at Stanford University. (2002). at <https://purl.stanford.edu/qd179zq3943>
Kunz, J. Concurrent Engineering of Product, Process, Facility, and Organization. (1995). at <https://purl.stanford.edu/cp016vk6775>
Kunz, J. Concurrent Knowledge Systems Engineering. (1989). at <https://purl.stanford.edu/sk877fn6909>
Kunz, J., Maile, T. & Bazjanac, V. Summary of the Energy Analysis of the First Year of the Stanford Jerry Yang & Akiko Yamazaki Environment & Energy (Y2E2) Building. (2009). at <https://purl.stanford.edu/wm764pd5088>
Kunz, J. & Fischer, M. Virtual Design and Construction: Themes, Case Studies and Implementation Suggestions. (2012). at <https://purl.stanford.edu/gg301vb3551>
Krisnamurthy, K. & Fruchter, R. Feedback on Observation of Communication among Design Consultants in Systemix Project. (1992). at <https://purl.stanford.edu/bc918yq1531>
Krishnamurthy, K. Version and Configuration Management for Collaborative Design. (1993). at <https://purl.stanford.edu/hn928yp6168>
Krishnamurthy, K. & Law, K. H. A Data Management Model for Change Control in a Collaborative Design Environment. (1996). at <https://purl.stanford.edu/hv896xb4949>
Koskela, L. Application of the New Production Philosophy to Construction. (1992). at <https://purl.stanford.edu/kh328xt3298>
Korman, T. M. & Tatum, C. B. Development of a Knowledge-Based System to Improve Mechanical, Electrical, and Plumbing Coordination. (2001). at <https://purl.stanford.edu/qh506cc0427>
Kopperud, R. J., Hildemann, L. M. & Roberts, P. V. Utilization of SARA Database to Identify Design Strategies for Minimizing Emmisions of Hazardous Chemicals. (1992). at <https://purl.stanford.edu/pr698gk8224>
Koo, B., Fischer, M. & Kunz, J. Formalization of Construction Sequencing Rationale and Classification Mechanism to Support Rapid Generation of Sequencing Alternatives. (2006). at <https://purl.stanford.edu/mw447fv7116>
Koo, B. & Fischer, M. Formalizing Construction Sequencing Constraints for Rapid Generation of Schedule Alternatives. (2003). at <https://purl.stanford.edu/mh950cz3375>
Koo, B. Formalizing Construction Sequence Constraints for the Rapid Generation of Scheduling Alternatives. (2004). at <https://purl.stanford.edu/gq345sm7410>
Koo, B., Fischer, M. & Kunz, J. A Formal Identification and Re-sequencing Process for Rapid Generation of Sequencing Alternatives in CPM Schedules. (2007). at <https://purl.stanford.edu/nz387yd9469>
Koo, B. & Fischer, M. Feasibility Study of 4D CAD in Commercial Construction. (1998). at <https://purl.stanford.edu/dh192xn0408>
Koga, Y. & Latombe, J. - C. Experiments in Dual-Arm Manipulation Planning. (1991). at <https://purl.stanford.edu/sf445sz1381>
Kiviniemi, A. Requirements Management Interface to Building Product Models. (2005). at <https://purl.stanford.edu/gh076mt5924>
Kiviniemi, A., Fischer, M., Bazjanac, V. & Paulson, B. PREMISS - Requirements Management Interface to Building Product Models: Problem Definition and Research Issues. (2004). at <https://purl.stanford.edu/ds532qd2802>
Kim, T. Wan. Predicting Space Utilization of Buildings through Integrated and Automated Analysis of User Activities and Spaces. (2013). at <https://purl.stanford.edu/tm100bc3326>
Kim, K. Distributed Coordination of Project Schedule Changes: An Agent-Based Compensatory Negotiation Approach. (2001). at <https://purl.stanford.edu/ps634zc6331>
Kim, K., Paulson, Jr., B. C., Petrie, Jr, C. J. & Lesser, V. R. Compensatory Negotiation for Agent-Based Project Schedule Optimization and Coordination. (2000). at <https://purl.stanford.edu/xp323pp1268>
Kim, T. Wan, Kavousian, A., Fischer, M. & Rajagopal, R. Improving Facility Performance Prediction by Formalizing an Activity-Space-Performance Model. (2012). at <https://purl.stanford.edu/fk563np7925>

Pages