Skip to content Skip to navigation

Publications

Found 48 results
Author Title [ Type(Desc)] Year
Filters: First Letter Of Last Name is T  [Clear All Filters]
Technical Report
Ichioka, Y., Teicholz, P. & Chinowsky, P. An Approach to Automated Architectural Floor Layout Generation with Case-Based Reasoning. (1991). at <https://purl.stanford.edu/zg998zb3669>
Mahoney, J. J. & C. Tatum, B. Barriers to CADD in the AEC Industry. (1990). at <https://purl.stanford.edu/kq567vf4968>
Russel, W. & Teicholz, P. Barriers to Electronic Data Exchange in the A/E/C Industry. (1993). at <https://purl.stanford.edu/bd299dp9861>
Taylor, J. & Levitt, R. Bridging the Innovation Gap in Project-Based Industries: 2003-2004 CIFE Seed Project Report. (2004). at <https://purl.stanford.edu/mt207xf6695>
Tatsumi, Y., Teicholz, P., Dong, W. & Sharma, M. A Construction Risk Management System: An Expert System for Structural Failure/Accident and Seismic Risk of Buildings. (1990). at <https://purl.stanford.edu/kz813vj9183>
Tatsumi, Y., Teicholz, P., Dong, W. & Sharma, M. A Construction Risk Management System: An Expert System for Structural Failure/Accident and Seismic Risk of Buildings. (1990). at <https://purl.stanford.edu/kz813vj9183>
Mahoney, J. J., C. Tatum, B. & Kishi, K. Construction Site Applications of CAD. (1990). at <https://purl.stanford.edu/vm843xb1525>
Blum, E., Giarrusso, F., Zorovic, S. & Tatum, C. B. Decision Analysis Techniques for Integration Technology Decisions. (1994). at <https://purl.stanford.edu/sp252xp4662>
Ekstrom, M., Taylor, J., Bjornsson, H. & Arnold, A. Developing Electronic Models to Support Internet Bidding. (2001). at <https://purl.stanford.edu/fh620gf8653>
Korman, T. M. & Tatum, C. B. Development of a Knowledge-Based System to Improve Mechanical, Electrical, and Plumbing Coordination. (2001). at <https://purl.stanford.edu/qh506cc0427>
Iwasaki, Y., Tessler, S. & Law, K. H. Diagrammatic Reasoning for Qualitative Structural Analysis. (1994). at <https://purl.stanford.edu/xm992mv9834>
Khedro, T. & Teicholz, P. The Federation of Collaborative Design Agents. (1997). at <https://purl.stanford.edu/fz917ft1900>
Fergusson, K. Jean & Teicholz, P. Impact of Integration on Industrial Facility Quality with Appendix. (1993). at <https://purl.stanford.edu/xj721fn3242>
Hansen, K. Lee, Johnson, K. D. & C. Tatum, B. Incentives for Integrated Facilities Engineering in the Architectural, Engineering and Construction Industry. (1990). at <https://purl.stanford.edu/zy431pj0486>
Teicholz, P. Integration of Microcomputer Applications: Current and Future Approaches. (1989). at <https://purl.stanford.edu/jx437pf4728>
Kunz, J., Jin, Y., Levitt, R. E., Lin, S. - D. & Teicholz, P. The Intelligent Real-Time Maintenance Management (IRTMM) System: Support for Integrated Value-Based Maintenance Planning. (1995). at <https://purl.stanford.edu/tg222gx7093>
Lin, S. - D., Kunz, J. & Teicholz, P. IRTMM Value Analysis Module. (1994). at <https://purl.stanford.edu/kh670sh5462>
Taylor, J. E. & Levitt, R. Modeling Systemic Innovation in Design and Construction Networks. (2005). at <https://purl.stanford.edu/hd530ky5374>
Johnson, T., Peterson, F., Myers, M., Taube, R. S. & Fischer, M. Predicting, Analyzing, and Educating on Wage Theft with Machine Learning Tools. (2018). at <https://purl.stanford.edu/mx396wr3611>
Reuss, M. C. & C. Tatum, B. Requirements and Tools for Transferring Construction Experience Between Projects. (1993). at <https://purl.stanford.edu/sw044bk0426>
Levitt, R. E., Tommelein, I. D., Hayes-Roth, B. & Confrey, T. SightPlan: A Blackboard Expert System for Constraint-Based Spatial Reasoning About Construction Site Layout. (1989). at <https://purl.stanford.edu/jv578zm0794>
Taylor, J., Levitt, R. & Mahalingam, A. Simulating the Role of Inter-Firm Relations in Construction on the Productive Implementation of Innovations. (2006). at <https://purl.stanford.edu/hb029bv6168>
C. Tatum, B. Structure and Characteristics of Knowledge From Construction Experience. (1993). at <https://purl.stanford.edu/cf647qd7704>
Vanegas, J. A., C. Tatum, B. & Colarelli, V. A Structure for Construction Input During Preliminary Design. (1988). at <https://purl.stanford.edu/vf864wq1988>
Arnold, J. Andrew & Teicholz, P. A Study of the Life Cycle Requirements for an Information Model of the Components that are Incorporated in Process Facilities. (1996). at <https://purl.stanford.edu/nj454tk3815>

Pages