Project Delivery
Main content start
Main content start
Results for: Project Delivery
- Hamledari, Hesam, and Martin Fischer. “Measuring the Impact of Blockchain and Smart Contract on Construction Supply Chain Visibility”, Advanced Engineering Informatics, 50, no. 2021 (2021): 101444. https://doi.org/10.1016/j.aei.2021.101444.
- Hamledari, Hesam, and Martin Fischer. “Role of Blockchain-Enabled Smart Contracts in Automating Construction Progress Payments”, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 13, no. 1 (2021). https://doi.org/10.1061/(ASCE)LA.1943-4170.0000442.
- Hamledari, Hesam, and Martin Fischer. “The Application of Blockchain-Based Crypto Assets for Integrating the Physical and Financial Supply Chains in the Construction & Engineering Industry”, Automation in Construction, 127, no. 2021 (2021): 103711. https://doi.org/10.1016/j.autcon.2021.103711.
- Martinez-Alonso, Wilfrido, Martin Fischer, and Andrew Peterman. “A Comparative Study of the Ecosystems for Prefabrication in Europe and the US”. Center for Integrated Facility Engineering, 2020. https://purl.stanford.edu/nd313bm4284.
- Pullen, Tyler, Daniel Hall, and Jerker Lessing. “A Preliminary Overview of Emerging Trends for Industrialized Construction in the United States”. Center for Integrated Facility Engineering, 2019. https://purl.stanford.edu/zh598fh8153.
- Kunz, John, and Martin Fischer. “Virtual Design and Construction: Themes, Case Studies and Implementation Suggestions”. Center for Integrated Facility Engineering, 2012. https://purl.stanford.edu/gg301vb3551.
- Gane, Victor, John Haymaker, Martin Fischer, and Vladimir Bazjanac. “Application of Design Scenarios Methodology to Evaluate the Effectiveness of Transparent Parametric Design Spaces”. Center for Integrated Facility Engineering, 2011. https://purl.stanford.edu/pp624fk9938.
- Senescu, Reid, Guillermo Aranda-Mena, and John Haymaker. “Relationships Between Project Complexity and Communication”. Center for Integrated Facility Engineering, 2011. https://purl.stanford.edu/xt189rg8036.
- Gerber, David, and Forest Flager. “Teaching Design Optioneering: A Method for Multidisciplinary Design Optimization”. Center for Integrated Facility Engineering, 2011. https://purl.stanford.edu/rc451fq0133.
- Khanzode, Atul. “An Integrated, Virtual Design and Construction and Lean (IVL) Method for Coordination of MEP”. Center for Integrated Facility Engineering, 2010. https://purl.stanford.edu/db106qv2525.
- Clevenger, Caroline, and John Haymaker. “The Need to Measure the Guidance Afforded by Design Strategies”. Center for Integrated Facility Engineering, 2010. https://purl.stanford.edu/zg713hx7204.
- Flager, Forest, and John Haymaker. “A Comparison of Multidisciplinary Design, Analysis and Optimization Processes in the Building Construction and Aerospace”. Center for Integrated Facility Engineering, 2009. https://purl.stanford.edu/mc198xh9178.
- Flager, Forest, Akshay Adya, and John Haymaker. “AEC Multidisciplinary Design Optimization: Impact of High Performance Computing”. Center for Integrated Facility Engineering, 2009. https://purl.stanford.edu/rb200qx5476.
- Yee, Peggy Ho. “An Automated Method to Identify Occupant Interactions in Renovations of Occupied Buildings”. Center for Integrated Facility Engineering, 2009. https://purl.stanford.edu/yr010gb4669.
- Ho, Peggy, Martin Fischer, and John Haymaker. “Automated Identification of Occupant Interactions in Renovations of Occupied Buildings”. Center for Integrated Facility Engineering, 2009. https://purl.stanford.edu/pt487nm2072.
- Chachere, John. “Causes and Effects of Rationale Clarity in the AEC Design Industry”. Center for Integrated Facility Engineering, 2009. https://purl.stanford.edu/qk265gz2370.
- Haymaker, John, and John Chachere. “Coordination, Design, Extreme Collaboration, ICE, Integrated Concurrent Engineering, Organization Models, Process Models, VDC, Virtual Design and Construction”. Center for Integrated Facility Engineering, 2009. https://purl.stanford.edu/fk542fd6085.
- Senescu, Reid, and John Haymaker. “Improving Design Processes through Collaborating, Sharing, and Understanding”. Center for Integrated Facility Engineering, 2009. https://purl.stanford.edu/qk084vw7946.
- Chachere, John. “Observation, Theory, and Simulation of Integrated Concurrent Engineering: Grounded Theoretical Factors and Risk Analysis Using Formal Models”. Center for Integrated Facility Engineering, 2009. https://purl.stanford.edu/bt714bw6192.
- Chachere, John, John Kunz, and Raymond Levitt. “The Role of Reduced Latency in Integrated Concurrent Engineering”. Center for Integrated Facility Engineering, 2009. https://purl.stanford.edu/bd089dx8723.